We started by preparing the existing substrate to an approved condition for re-coating. Next, we prepared, primed, and detailed all the critical details with the proper sealant and crack bridging, waterproof base coat to stop the potential for water intrusion. Afterwards, we applied 2 heavy-duty, high traffic bearing, and low modulus broadcast coats for optimal wear resistance. Finally, a clear seal and lock coat were applied for additional durability and clean-ability while still leaving sufficient profile for a non-skid finish.