We began by mechanically grinding the entire surface to remove the existing failing coating and prepared the substrate to the proper profile for new coating. Next we removed failing control joints and routed cracks in the substrate. We then carefully installed the primer, base slurry coat, solid color top coat, and elastomeric joint sealant.