Construction began with locating and drilling each caisson for the structural columns. Columns were set, braced, and secured with concrete footers before the installation of rafters, purlins, and the remaining structural framework. Once framing was complete, crews installed the roof sheeting and trim. The final construction stages included lighting installation, painting the carport structures, and applying a fresh seal coat and new parking striping to the asphalt.