Prior to mobilization, DCPS developed a comprehensive project plan that included labor deployment, housing accommodations, material procurement, and site logistics. Two Colorado-based crews were mobilized and housed locally throughout the duration of the project, allowing the team to maintain consistent production and quality control.
Once on site, the project began with a detailed assessment of all exterior building elevations to identify stucco deficiencies, termite-damaged areas, and surfaces requiring preparation. Damaged components were repaired or replaced as needed to restore the integrity of the building envelope.
Following repairs, crews completed surface preparation and applied a new exterior paint system across the community. Work was carefully coordinated to minimize disruption to residents while maintaining safe access throughout the property.
Throughout the project, DCPS provided active supervision and communication to ensure quality standards were maintained and project objectives were achieved. The completed improvements significantly enhanced the property’s appearance, helping ownership create a more attractive living environment and strengthen the community’s appeal to students and future residents.