Multi-Site Public School Mill & Overlay

4” Mill & Overlay

Denver Public School Locations

Multi-Location K-12 Education Facilities in Denver, Colorado

Location

Denver, Colorado

Summary

DCPS provided summer asphalt rehabilitation services for two public schools in Denver, Colorado. The projects focused on restoring aging paved surfaces through mill and overlay work while navigating the access and scheduling requirements associated with active school properties. At one location the scope included a four-inch mill and overlay within a compact urban campus located just south of downtown Denver. The second location in the district’s summer pavement improvement program required a mill and overlay

Challenge

This project presented location challenges and limited working space. The campus offered tight working quarters for milling machines, paving equipment, haul trucks, and crew vehicles.

Unlike an open commercial parking lot, the school’s confined layout left little room for equipment staging or material movement. Crews had to carefully manage each phase of the project so machinery could enter, operate, and exit without interfering with surrounding buildings, access points, or nearby neighborhood activity.

As with most summertime school projects, the construction window also had to account for ongoing school programming, staff activity, and community use rather than assuming the campus would remain completely vacant.

Solution

DCPS developed a controlled sequencing plan that limited the number of operations occurring within the confined work area at one time. Equipment access, milling, material removal, and asphalt placement were coordinated in stages to prevent congestion and maintain a safe, organized site.

The team adjusted staging and delivery activity to match the campus layout, ensuring that trucks and paving equipment could move through the site efficiently despite the limited space.

Consistent communication with district representatives helped the team coordinate access requirements and keep stakeholders informed as the work progressed.

Before work began, DCPS reviewed the available access points, staging areas, and equipment movement paths. Work zones were then established to separate paving operations from school and neighborhood activity.

At the first site, crews milled the existing pavement to a depth of four inches. Removed material was hauled away in coordination with the milling operation so the limited site did not become congested. The milled surface was then cleaned and prepared before the new asphalt was placed and compacted.

The second location included mill and overlay work as part of the district’s pavement improvement program.

Through careful planning and disciplined site management, DCPS was able to perform substantial asphalt rehabilitation within the restricted working conditions of an urban school campus.