The project began with a site evaluation to confirm that the pavement condition was suitable for rejuvenator treatment. Once approved, the asphalt surface was thoroughly cleaned to remove debris and ensure proper product penetration. The rejuvenator was then applied uniformly using calibrated spray equipment to achieve the manufacturer’s recommended coverage rates.
As the material penetrated the asphalt matrix, it helped restore lost binder oils and rebalance the pavement’s internal structure. DCPS carefully coordinated the work to maintain tenant access and minimize disruption to daily operations. After the application cured, the pavement was reopened to normal traffic. The completed treatment refreshed the pavement’s appearance while supporting a proactive maintenance approach designed to extend the life of the asphalt surface.